SML carried out a tandem lift operation of two downcomer ducts using LR1750 (SLDB Configuration) to reach the elevation height of 44mtr in a Steel plant at Angul(IN). The Downcomer Ducts were weighing 250 & 100MT respectively. The workspace was very confined for the crane to lift the load in the service radius. In response, SML’s team of experts reeved the 100MT load from an identified point for safer and faster erection, so that it could be taken to the furnace conveniently. With tremendous coordination with our lifting partner, downcomer ducts were successfully installed within the stipulated timeframe.